Crane LIfts New Piping to Cyclone

June 30, 2017

Crane Lifts New Piping to Cyclone

It was a rare treat to watch this incredibly large crane set up in the front parking lot of Custom. They lifted a new pipe to the roof so it could be added to the cyclone.  This new piece will pull scrap from the new BOBST 1636-NT  being installed.

 

Back To News